02-05-2017, 09:29 AM
I finished this one a couple of weeks back.
Before.
The job involved removal of existing kitchen, ceiling, wall tiles & laminate flooring. A new plastered ceiling with LED downlights, additional circuit for Induction Hob, new water & waste pipes for W/M, additional sockets etc.
Before.
The job involved removal of existing kitchen, ceiling, wall tiles & laminate flooring. A new plastered ceiling with LED downlights, additional circuit for Induction Hob, new water & waste pipes for W/M, additional sockets etc.