21-08-2013, 09:50 AM
Finished this one last week.
Job involved stripping all the plaster off the walls, new dedicated H&C supplies for the shower, new plastered ceiling, 3 spot lights, extractor fan, tall towel radiator, shower cubicle, fitted furniture in Horizontal Driftwood with matching worktop, and all walls fully tiled in 600x300 tiles. Basin and W/C are both Vitra.
The new floor covering is going to be Karndean.
Before.
After
I've got to fit the kitchen next week, but I have already done the prep on that, so its just pretty straightforward.
Snezza.
Job involved stripping all the plaster off the walls, new dedicated H&C supplies for the shower, new plastered ceiling, 3 spot lights, extractor fan, tall towel radiator, shower cubicle, fitted furniture in Horizontal Driftwood with matching worktop, and all walls fully tiled in 600x300 tiles. Basin and W/C are both Vitra.
The new floor covering is going to be Karndean.
Before.
After
I've got to fit the kitchen next week, but I have already done the prep on that, so its just pretty straightforward.
Snezza.