04-01-2016, 11:45 AM
I finished off these over xmas , very pleased with how they came out. All in moisture resistant mdf and solid beech face frames. Doors frame and panel with added panel bead. I used inset blum hinges on 3mm plates to clear the 4mm reveal on the face frames. Led lighting on open shelves. Sound system and sky hidden in right hand units and tv is fitted to the right hand wall (out of shot). Air con unit hidden in one unit which doesnt get used much.
The paint is farrow and ball "Clunch" all hand painted by my decorator.
The room is a huge kitchen diner extension so was great to work in. Everything was made off site in my workshop then delivered as a flat pack and assembled on site.
The paint is farrow and ball "Clunch" all hand painted by my decorator.
The room is a huge kitchen diner extension so was great to work in. Everything was made off site in my workshop then delivered as a flat pack and assembled on site.