10-09-2014, 08:39 PM
Before....
During
After....
The job involved removal of an existing wall to add more space and light, new ceiling and lighting and extractor fan. In the process of stripping the existing room, all the render and plaster came off with the tiles so I had to dryline all the walls and square up all 4 corners as the room was rhombus shaped......!!!!!
All the pipe work was concealed and an additional towel rail added.
The original bathroom wall cabinet was re-used as it was in good condition and good quality (Showerlux).
The Lustrolite panels are Atoll blue and Arctic white.
Flooring is Aquastep waterproof laminate tiles in Travertine White.
Snezza.
During
After....
The job involved removal of an existing wall to add more space and light, new ceiling and lighting and extractor fan. In the process of stripping the existing room, all the render and plaster came off with the tiles so I had to dryline all the walls and square up all 4 corners as the room was rhombus shaped......!!!!!
All the pipe work was concealed and an additional towel rail added.
The original bathroom wall cabinet was re-used as it was in good condition and good quality (Showerlux).
The Lustrolite panels are Atoll blue and Arctic white.
Flooring is Aquastep waterproof laminate tiles in Travertine White.
Snezza.