20-04-2011, 06:52 PM
Hi everyone,
Really pleased with the way this one turned out as there was a lot to get in and certain parts had to be designed around the ladies height as well as get the dishwasher and fridge in where really they shouldn't fit but all in all it went well and although it was very uncomfortable at the time I should be quite please that the customer started proper crying with joy.
First time I've fitted an external extractor, it fits on the chimney pot on the roof and pulls the waste air through rather than pushes. The contoller/grease filter fits the same as any canopy extractor.
400mm deep wall unit to try and hide the soil stack that's 320mm from the wall.
I designed the fake chimney breast so that it is useable space with opening doors and spice rack draws at the bottom.
There has been posts in the past about how members like to finish there end panels. I prefer this way as if its run staight down to the floor you get an internal corner which collect dirt and will get kicked about.
The range still need to be fitted and the electrician needs to finish but I hope you like. Also obviously the tiling needs to be done.
PS JRB this is where the splash back we discussed is going
I welcome any feedback good or bad as there is always different ways to do things.
I hope the pictures come out as at the moment there's a red line around them saying file too large
Really pleased with the way this one turned out as there was a lot to get in and certain parts had to be designed around the ladies height as well as get the dishwasher and fridge in where really they shouldn't fit but all in all it went well and although it was very uncomfortable at the time I should be quite please that the customer started proper crying with joy.
First time I've fitted an external extractor, it fits on the chimney pot on the roof and pulls the waste air through rather than pushes. The contoller/grease filter fits the same as any canopy extractor.
400mm deep wall unit to try and hide the soil stack that's 320mm from the wall.
I designed the fake chimney breast so that it is useable space with opening doors and spice rack draws at the bottom.
There has been posts in the past about how members like to finish there end panels. I prefer this way as if its run staight down to the floor you get an internal corner which collect dirt and will get kicked about.
The range still need to be fitted and the electrician needs to finish but I hope you like. Also obviously the tiling needs to be done.
PS JRB this is where the splash back we discussed is going
I welcome any feedback good or bad as there is always different ways to do things.
I hope the pictures come out as at the moment there's a red line around them saying file too large