22-11-2014, 09:19 PM
(22-11-2014, 09:08 AM)snezza 31 Wrote:(22-11-2014, 01:55 AM)Colour Republic Wrote: That's some going to do that in just over a day though mate
I agree ...!!!!!!
What length and depth does the Maia come in at?
How do you mount the St/Steel sink in the top?
Did you have to rout drainer grooves in the top?
What grade of grit do you sand the tops to? 320, 400, 500...???
Do the Radii on the peninsular section come pre-done or did you have to do those as-well?
One of the reasons I ask is, I have been fabricating a set of BB Encore tops this past week in my workshop and it has taken me 3 days.
I had 3 Radii to do, a St/Steel undermount sink, drainer grooves etc etc. When the tops get installed in a few weeks time there will be 4 joints to cut and join.
Snezza.
Lengths varied.
3x 900x3.6
1x 600x 3.6
1x 600x 1.8
Sink module comes from the manufacturer. They had brackets for them that you screw down.
Grooves- no comes done. Just got the sink.
Grades- I go up to a 360 then brillow pad, then polish on a white top.
Rounds pre done.
After all that are you wondering why IT wasn't done in half a day. Haha
"I HAVE ENOUGH FESTOOL'S ".......SAID NO FITTER EVER!!!?