14-08-2014, 08:08 AM
Thanks for all your feedback. Like I said It's 95% complete. Funny enough the drawers where all aligned perfect but since they have been filled and used they need re-adjusting. Also the coving does need to be filled.
It was not possible to move the base units away form the walls as that would not have left enough room the the tall cupboards (i think I'm right here?). this is why theres not much of a gap between the taps/hob & up-stand.
We did considor having the oven in the middle but this meant having the pull-out larder near the base units. This would mean that the we would only be able to access the larder from one side!
I cut the Aluminium profile with a hack saw.
Again thanks for the feedback!
It was not possible to move the base units away form the walls as that would not have left enough room the the tall cupboards (i think I'm right here?). this is why theres not much of a gap between the taps/hob & up-stand.
We did considor having the oven in the middle but this meant having the pull-out larder near the base units. This would mean that the we would only be able to access the larder from one side!
I cut the Aluminium profile with a hack saw.
Again thanks for the feedback!