30-07-2017, 11:35 PM
Well, i must admit this is going more slowly than I thought. ( yes I told you so say the crowd)
Having to do some plastering as I am going and that's bit of a slow down as well.
I had a clear idea exactly how I wanted the final look, but achieving it with these units I have bought is taking a lot of " manipulating " of the tall units. 5 of them in total, well 4 x 600 and 1 I plan on cutting well down to accommodate a pillar that cant be moved. (supporting wall.)
Arlene's one stipulation, our lass, thought in last units, the cooker etc were set higher than she would have preferred making the top of the tower units too high and wanted them lower. ok, i thought, no problem. trying to sort it has taken a lot longer than I thought. Of course, thers a myriad of holes in the carcass, but are they where you want them ..... no ....... chance. Not without things going higher than I wanted anyhow. We have a twin oven, and in the adjacent tower want a oven/micro with the coffee machine on top. They are all AEG and I thought they would fly in.
Think I've got it sorted in the end but it has taken me best part of the day. ha ha.
Think this is what makes me a DIY man and yous lot professionals.
Adapting the units for the rails has not been a problem, so far anyhow. Mind you I am not onto the base units yet, just done the towers.
To add to all this Arlene's just lost the dog, and had me out 2 half hrs walking through 2-foot grass and muddy woods in the dark looking for him. Thought he had gone for good. Try looking for a tone deaf black dog in the dark for a laugh. Especially with half your sole hanging off your trainer letting the water in !.
Anyhow a little update on how it's going. I still have no inserts sorted, although Sneeza has said he may have an option for me. Just looking at it I think I could knock something up at work that may do the job if I end up being stuck.
Time to get the beers out and have a good think about this.
Cheers.
Having to do some plastering as I am going and that's bit of a slow down as well.
I had a clear idea exactly how I wanted the final look, but achieving it with these units I have bought is taking a lot of " manipulating " of the tall units. 5 of them in total, well 4 x 600 and 1 I plan on cutting well down to accommodate a pillar that cant be moved. (supporting wall.)
Arlene's one stipulation, our lass, thought in last units, the cooker etc were set higher than she would have preferred making the top of the tower units too high and wanted them lower. ok, i thought, no problem. trying to sort it has taken a lot longer than I thought. Of course, thers a myriad of holes in the carcass, but are they where you want them ..... no ....... chance. Not without things going higher than I wanted anyhow. We have a twin oven, and in the adjacent tower want a oven/micro with the coffee machine on top. They are all AEG and I thought they would fly in.
Think I've got it sorted in the end but it has taken me best part of the day. ha ha.
Think this is what makes me a DIY man and yous lot professionals.
Adapting the units for the rails has not been a problem, so far anyhow. Mind you I am not onto the base units yet, just done the towers.
To add to all this Arlene's just lost the dog, and had me out 2 half hrs walking through 2-foot grass and muddy woods in the dark looking for him. Thought he had gone for good. Try looking for a tone deaf black dog in the dark for a laugh. Especially with half your sole hanging off your trainer letting the water in !.
Anyhow a little update on how it's going. I still have no inserts sorted, although Sneeza has said he may have an option for me. Just looking at it I think I could knock something up at work that may do the job if I end up being stuck.
Time to get the beers out and have a good think about this.
Cheers.