Kitchen Fitters Forum
Started today - Printable Version

+- Kitchen Fitters Forum (https://www.kitchenfittersforum.com)
+-- Forum: The Old KFF (https://www.kitchenfittersforum.com/forumdisplay.php?fid=138)
+--- Forum: Public Forum - Free Posting For Non Registered Guests (https://www.kitchenfittersforum.com/forumdisplay.php?fid=4)
+---- Forum: Members Gallery - Kitchens (https://www.kitchenfittersforum.com/forumdisplay.php?fid=18)
+---- Thread: Started today (/showthread.php?tid=3412)

Pages: 1 2 3 4 5 6


Started today - chip off the block - 06-08-2012

Started this morning on this porcelanosa kitchen.
View this morning
[Image: IMG_20120806_082456.jpg]
End of the day
[Image: IMG_20120806_173415.jpg]
Nice touch on the sink units
[Image: IMG_20120806_173425.jpg]
Metal legs
[Image: IMG_20120806_173443.jpg]

Thing i didnt like was the dead size end panels so they have a gap as scribing to get them back might impact on appliances but i dont know because they aint there.


RE: Started today - nsk - 06-08-2012

it looks well made, hows it been so far to fit?


RE: Started today - chip off the block - 06-08-2012

Easy to fit as it is a case of leveling a unit and screwing it back. Doors and handles are all fitted. All drawers have non slip mats fitted allready. Hob unit has a solid top about 100mm down for heat shiels and then 2 metal rails to support worktop which is nice. Wall unit has a full length hanger which was good as cables fell right where normal bracket would be. On prob is 2 slightly damaged drawers that have rubbed together in transit, not sure how long replacements will take as its 10 weeks for the kitchen....


RE: Started today - nsk - 06-08-2012

(06-08-2012, 09:05 PM)chip off the block Wrote: Easy to fit as it is a case of leveling a unit and screwing it back. Doors and handles are all fitted. All drawers have non slip mats fitted allready. Hob unit has a solid top about 100mm down for heat shiels and then 2 metal rails to support worktop which is nice. Wall unit has a full length hanger which was good as cables fell right where normal bracket would be. On prob is 2 slightly damaged drawers that have rubbed together in transit, not sure how long replacements will take as its 10 weeks for the kitchen....

it sound pretty well thought out, always pleasing when cabs are well made


RE: Started today - chip off the block - 06-08-2012

The cabs have 9mm backs and are solid as a rock. Solid 18mm tops which makes em a 2 man lift as theres nothing to hold


RE: Started today - Daniel - 06-08-2012

Metal legs and solid backs are nice ...... was in one of their showrooms a few years back and they do indeed look like nice units - not cheap though !!


RE: Started today - chip off the block - 06-08-2012

The plith vents are nice too. Predone 600mm sections of plith in aluminium with slots.


RE: Started today - Daniel - 06-08-2012

Yeah those pre-fab'd vents are nice ..... my Italian supplier used to do them but for some reason stopped last year ThumbDown


RE: Started today - chip off the block - 06-08-2012

Also put the roof on this job with a 330kg ridge